Solar Power Cable and Power EPC Project

Green Energy Sustainability, Providing the Best Solution - Solar Power Cable and Electricity EPC Project
Since the Paris agreement is offically effective in 2016, the fight against climate change has become a global consensus. The contracting governments have agreed to control the rise of the earth's temperature within 2℃. and hope to reduce it within 1.5℃. Based on the international trend and sustainable national development, PEWC have the concpet of carbon neutrality toward fucture energy policy in hope to replace fossil fuels with low-carbon energy which won't generate any pollution to earth.
Carbon neutral (or carbon neutrality) refers to a zero release of total carbon by a way of offsetting to reach environmental balance.

Global

According to the International Energy Agency (IEA), the COVID-19 has reversed the trend of global energy demand growth, but demand for clean energy such as solar and wind power is still growing faster.
Based on the current energy policies of each countries, the total renewable energy is expected to beyond coal power as 42% of total global energy in 2030.

Taiwan

According to the Ministry of Economic Affairs' White Paper on Energy Transition, to create a clean and low-carbon homeland as a green energy country,Taiwan is expected to reach 20% of renewable energy in 2025 with 2560 millions kilowatt-hour by mainly focus on solar power and offshore wind power.

PEWC has built a large area of solar panels since March 2018 with an accumulated carbon reduction of 2,664 metric tons. In 2021, and an accumulated solar power generation capacity of 4,824 Mwh Yangmei plant
Solar system
Solar system
Introduction of EPC
The EPC department can provide solutions for green energy plants in cable circuit design..

Integration of system design and equipment supply services, PEWC had enhance the overall quality and reliability.

PEWC have cable manufacturing expertises with experienced engineering team to customize the cable design, system planning, and engineering service based on customers' requirements.With more than 30 years of experience in high voltage cable engineering, PEWC have high quality, safety and completable ability to provide completed services including system design, equipment supplement to construction, testing completion, and follow-up maintenance.

Under the promotion of energy policy, the constructions of offshore wind power and solar power plants are growing. The plants are difficult to operate due to several factors by environmental construction including outdoor pipe laying and high temperature. The cable must meet the requirements of weather resistance, drastic temperature changes, ultraviolet rays, and chemical erosion with certification of UL 4703, EN 50618, and IEC 62930 to provide durable and stable quality.

UL4703 certification

UL4703 certification

EN50618 certification

EN50618 certification
Download Product Catalog